Turbine selection based on wind resource assessment and project technical requirements.

We carry out the selection of wind turbines based on the results of assessing the wind characteristics of the area and taking into account the technical requirements of the project.

Having an international standard wind measurement report, we search for several of the most optimal WTG models from different manufacturers with the calculation of average annual electricity generation based on the machine's «power curve». When measurements are not available, we may use international meteorological databases, though this approach can introduce up to 10% error in generation estimates.

We offer various options for discussion with the Customer: using new machines or those that have been in operation. This includes not only the cost of equipment but also the volume of output, operating costs, service, and warranty obligations.

This process begins from the moment of wind potential assessment. We study current market offers, planned supply volumes, manufacturer workload, delivery times, pickup locations, payment and shipment terms, availability of technical documentation and certificates.

We offer assistance in selecting WTG models throughout Belarus, Kazakhstan, and Russia. For specialist consultation, contact us at +375 (29) 747-07-09 or info@ecotek.pro.
The price of a wind turbine and its installation can vary significantly depending on several factors, including the capacity of the installation, project location, chosen manufacturer, cost of grid connection, and other additional expenses. In general, the price for installing a wind turbine can start from hundreds of thousands of US dollars for small-scale installations and reach millions of US dollars for large industrial setups.
As of today, the majority of wind turbines are manufactured in China. China is the world's largest producer of wind turbines and home to many leading companies in this industry, such as Goldwind, Envision Energy, Mingyang Smart Energy, among others.
When selecting a wind installation, it is necessary to consider parameters such as the need for electrical energy/authorized volume of electricity supply release, wind speed on site (average, maximum and extreme), local climatic conditions, technical requirements for connecting to the power grid transmission network.
The appropriate capacity depends on the quantity and energy consumption schedule of your project's resources and the wind energy potential of the proposed construction site. Also, the choice of unit power for WEU may be influenced by the availability of land plots for placing wind farms, as well as the technical characteristics of the electric grid.
Site analysis is one of the main stages in implementing a project during wind turbine construction. At this stage, the most suitable construction sites are determined that meet the requirements of the regulatory legal framework and technical specifications of the wind turbine manufacturer.
The economic efficiency depends on many factors, including the cost of installation and maintenance, energy production, electricity prices, tax incentives, subsidies, availability of financing, etc.
On the current day, there are several major industrial wind turbine manufacturers such as Vestas, Siemens Gamesa, GE Renewable Energy, Nordex, and Enercon.