Urban-adjacent WTG: installation, commissioning, O&M, and monitoring.
Project stages
- Installation. Full cycle of installation works in an urban area.
- Commissioning. Systems setup, coordination with the grid operator.
- Operation. Regular maintenance, scheduled inspections.
- Monitoring. Remote parameter control, prompt response to faults.