Klochkovo wind farm (Minsk region) — 2 turbines (Enercon E40, NegMicon NM 1000/60), 1.5 MW. Full turnkey lifecycle with ongoing service.
Project stages
- Pre-design. Wind measurements, potential analysis, optimal model selection.
- Supply. Logistics and delivery of two different WTG models.
- Construction. Foundations and erection of two different WTG types.
- Operation. Scheduled maintenance, repairs, 24/7 monitoring.